Home Fleche-texte-grisRepertory Fleche-texte-gris A229 Fleche-texte-gris LA CIME SCHOOL
Projet

LA CIME SCHOOL

Architecte

A229

Programe
The project consisted of the creation of a new type 4 (motor disability) secondary school. The students present reduced mobility and there will be a maximum of 8 per class. The school had to be able to accommodate up to 50 students and 35 professionals of different categories. A day care centre is integrated in the same building as well as a dining hall which is multi-purpose, and which could be used for events or as a cafeteria for the park, during non-school hours.
[...]
About
This mixed program is unified in a simple and efficient plan : four bars, each one presenting its own character, are assembled around a central open space, like a big courtyard house :
- The school: flexible classrooms and a large and lively corridor
- The day care centre: a bright corridor open to the courtyard gives access to the offices and therapy rooms
- The dining room: a wide space, free of columns and fully glazed towards the courtyard and the park. An open kitchen and movable furniture help allow different spatial layouts.
THE PROJECT
- The porch: a roof protecting part of the courtyard from the rain and creating the entrance to the school
Angles are carefully designed to accommodate service areas (restrooms, technical rooms) while keeping visual connexions with the outside.
The whole project is conceived as a friendly place to live, a real home for its users.
[...]
Typology
Education
Status
Built
Year of conception
2018
Year of delivery
2020
Client
Association des Parents de La Famille asbl
Total budget
2200000
Per square meters
1500
Area
1400
Stability
Stabili-D
Special techniques
Pluricite

Avenue Paul Stroobant 41 à 43
1180 Uccle

Plus d'informations
A229

Repertory

Projets

Newsletter

subscribe

All our newsletters

WBA

Place Sainctelette 2
1080 B - Bruxelles


T +32 2 421 83 72
contact@wbarchitectures.be

back to top
Concept & Design : Salutpublic | Development : Bien à vous