Project

PFIZER R&D CENTER

Architect

Syntaxe Architects

Programme
Construction of an extension to a pilot plant, with production lines, R & D laboratories (classified BL3 +), storage areas and offices
About
The construction of the extension (which triples the capacity of the existing pilot plant) was carried out while the factory was in full use. The building was designed and built in a record 18 months schedule. Research Laboratory (unique in Belgium and even in Europe by its size and layout) allows the scientifics to work on vaccines linked with emerging diseases (fatal for humans and animals).
Typology
Laboratoire de recherche scientifique
Status
Construit
Year of conception
2009
Year of delivery
2011
Client
PFIZER ANIMAL HEALTH
Total budget
22.000.000 €
Per m² budget
5.000
Constructed area
4.400 m2

Rue Laid Burniat, 1
1348 Louvain-La-Neuve
Belgium

More information
Syntaxe Architects

Other projects

Other projects

Répertoire

Repertory

Consult our directory of projects in Fédération Wallonie-Bruxelles

> See all projects

Newsletter

subscribe

WBA

Place Sainctelette 2
1080 B - Brussels


+32 2 421 83 64
contact@wbarchitectures.be

back to top
Concept & Design : Salutpublic | Développement : Bien à vous