Renovation of the Maison de la Culture of Tournai: 700-Seat Concert Hall, 350-Seat Concert Hall, Exhibition Space, Library, Workshops, Offices, Cafeteria

About

The renovation project for the Maison de la Culture in Tournai begins with a complete clearing out of its spaces. Stripping the building back to its structure reveals its inherent spatial, material, and functional qualities, allowing for the rediscovery of bright, open, and legible spaces that can be adapted to the specific needs of each institution.

Following a measured approach, a limited set of interventions enables a complete reorganization of the building through simple spatial articulations. For example, the double-height foyer is reinstated as the central reception area for all visitors, reaffirming the original ambitions of the Maison de la Culture. A restrained aesthetic, highlighting the building’s original materials now brought back into view, allows each institution to assert its identity within a unified whole.

This spatial reconfiguration also ensures that all areas and technical systems meet current standards, preparing the building not only for today’s uses and requirements but also for the unpredictable needs of the future.

Typology
Culture
Status
Construit
Year of conception
2010
Year of delivery
2024
Client
Ville de Tournai
Total budget
13 460 000 €
Per m² budget
1120
Constructed area
12 000 m2

Avenue des Frères Rimbaut 2
7500 Tournai
Belgium

More information
https://www.apractice.be/projects/a-cultural-building

Other projects

Other projects

Répertoire

Repertory

Consult our directory of projects in Fédération Wallonie-Bruxelles

> See all projects

Newsletter

subscribe

WBA

Place Sainctelette 2
1080 B - Brussels


+32 2 421 83 64
contact@wbarchitectures.be

back to top
Concept & Design : Salutpublic | Développement : Bien à vous