- Project
Renovation and extension of the Cité Administrative in Liège
- Architect
Canevas - Architecture et ingénierie
Baumans-Deffet, Architecture et Urbanisme
- Programme
The architectural reconversion of the Cité Administrative, built in 1966 by architects Poskin and Bonhomme, more broadly feeds into a strategic urban project in the renewal of the Liège Metropolitan Area and, more specifically, of the historic heart.
- About
At an urban planning scale, the project fits into an overall revitalisation of the neighbourhood by taking advantage of the arrival of the tramway. The splitting of the tram stops (city entry and exit) on either side of the Cité, at Quai de la Batte and in Feronstrée, ensures ideal soft mobility accessibility for the +/- 500 staff and also activates the foot of the tower, transformed into a true public space offering multiple uses and new urban routes.
In addition, a bicycle parking facility with 115 spaces is planned in the basement (ideally connected to the city centre and the Ravel).
At ground level, the slab is freed from the annexe buildings that currently form an oversized, impenetrable urban block. This porosity multiplies the urban links between the Meuse and the Coteaux, reveals new potential pedestrian continuities towards the Îlot Saint-Georges, streamlines routes, and enhances the symbolic proximity of the citizen to their Cité Administrative. The removal of the existing annexes also allows the "tower" to be highlighted, a significant testament to modernist architecture, while respecting the spirit of a "belfry" (verticality that stands out in the built landscape).
Freed from its base, the programme (a more accessible administration) involves shaping a new volume that belongs to the tower while preserving its strength and autonomy. This extension belongs to the city's morphology through its scale and the composition of its façades (urban continuum) and is autonomous through its volume and materiality in the urban space.
To the north, directly linked to a generous esplanade, a single entrance is sheltered by a loggia at the first level. This "canopy" is the tangible sign of the new entrance to a renovated Cité. The accompanying space forms a public meeting and conviviality area (17.50 m x 50 m) for waiting and exiting the Cité.
To the east, the peristyle accommodates a ramp and stairs improving accessibility from Rue Saint-Jean-Baptiste.
To the south, Rue Barbe d’Or is partially reconfigured and widened by the very urban façade of the cité administrative extension.
By contrast with the tower, the internal volumetric complexity of the "associated" object offers users a partially interiorised proximity landscape. The voids allow, on the one hand, natural light to be brought into the heart of the built mass and, on the other hand, well-oriented, high-quality outdoor spaces (gardens/terraces) to be offered to users in relation to more collective functions (meeting rooms, cafeteria, waiting areas). Levels 0 to +2 are dedicated to spaces accessible to the public. Levels +3 to +5 group the more collective functions of the programme. Partial duplex arrangements allow certain spaces to be connected (cafeteria/meeting, public reception areas 0/+1).
The new built volume is simple and urban in its overall perception. The dimensions of the window openings and spandrels derive from the proportions of the tower's curtain walls. A lineage exists between the two volumes. The materiality of the extension, a grey/stone-toned brick, contrasts with the glazed tower while associating with it through the brick modulation in tiling (continuous vertical joints).
The tower proposes a vertical addition of identical floor plates fitted out according to the New Ways of Working principle combined with the quality of views over the distant landscape.
The project respects the modernist architectural quality of the façades and integrates the various constraints related to an architecturally and technically ambitious project.
The architectural concrete frames of the main façades, degraded and cracked, exhibit disorders and risks of instability. They are dismantled along with the existing frames. The budget is invested in reinterpreted façades rather than delicate, costly renovations that are detrimental to achieving high energy performance.
The issue of transparency, very present in modernist architecture, is reinterpreted by the interior organisation that creates through offices on either side of the recomposed vertical circulations in a compact, unitary central core.
Curtain walls integrate the existing rhythm and alternation of traves of different dimensions. They reprise the cross-reading of a main plan of long verticals and a secondary horizontal plan. Fixed sunshades complete this "fabric". This ensemble rewrites a new grid while respecting the original qualities of the main façades.
The two blind gables must be thermally insulated and clad with a facing. These large surfaces are magnificent opportunities to host photovoltaic panels. The glazing of the panels is planned tinted in anthracite grey tones to soften their presence in relation to the general tones of the context and the renovated building.
The R+18, accessible autonomously, is a rooftop terrace over the city, a support for collective imagination.
A new treatment of the crown recalls the singular architectural concrete elements of the existing tower. A V-shaped metal structure reprises a grating, supporting underface lighting. From afar, without creating a roof, the grating should give an impression of surface. The eye finds a "stop" before ascending to the sky. At night, the lighting festoon the tower.
The urban planning, architectural, technical, energy, and financial project maximises the site's usage potential while anticipating the evolution of the city and working methods and practices in the decades to come. The project reveals a very high adaptation potential, a sign of durability and environmental awareness. The building is designed to achieve the zero-carbon environmental target.
The three works of art present on/in the building are integrated into the new project. The mural painting by artist Nicolas Kozakis depicting the outlines of the Cave of the Nativity (2006), located at the top of the south-west gable, will be reinterpreted through the installation of a very thin shiny film containing photovoltaic cells. The sculpture by Idel Ianchelevici (1909–1994) entitled " Deux jeunes filles qui se coiffent les cheveux ", present in the patio of the existing buildings, will be relocated to the end of a linear planter situated in front of the building entrance. The quotation from Michel de L’Hospital (1505–1573) engraved at the base of the south-west gable will be repositioned in the building's waiting area.- Typology
- Bureaux
- Status
- Construit
- Year of delivery
- 2023
- Client
- Ville de Liège
- Total budget
- 30 000 000 €
- Constructed area
- 10.500 m2
Potiérue 5
4000 Liège
BelgiumMore information
Canevas - Architecture et ingénierieOther projects
Other projects
- Infrabel Academy à Molenbeek2020Bruxelles

- Public square in Dinant2012Dinant

- Water treatment plant in Ans2016Ans

















